Energy Efficiency
Studies Include:
- Whole-building energy simulations
- Daylight and glare studies
- Photovoltaic analyses
- Computational Fluid Dynamics
- Monitoring & measurements for HVAC
- Infrared thermography
- Tracking of ventilation, air movement and infiltration
Regulatory compliance assistance:
- NYC Local Law 86
- NYS Executive Order 111
- NYC School Construction Authority
- Battery Park City
- Lower Manhattan Development Corp.
Financial:
- Incentives (Federal EPAct 2005, New York State Green Building Tax
Credit, NYSERDA New Construction Program, Connecticut programs, and
others)
Green Building, LEED Consulting
Broad range:
- Campus guidelines, corporate programs, government standards and legislative initiatives
LEED:
- Numerous projects Certified, Silver, Gold & Platinum
- US, Great Britain, Korea, China, Brazil, Abu Dhabi, Italy, Russia, Germany
- From 10,000 sqft to 5 million sqft
- LEED for New Construction & Major Renovation, Commercial Interiors, Core & Shell, Schools, Existing Buildings and O&M, New Development, and Labs Development
Other green programs:
- NYC Local Law 86, NYS Executive Order 111, NYC School Construction Authority, Battery Park City, Lower Manhattan Development Corporation, NYS Green Building Tax Credit, Federal Tax Credits & Deductions, etc.
Commissioning, Measurement, Monitoring
Commissioning:
- Enhanced and Fundamental Commissioning
- Instrumentation-assisted (meters, test devices, infrared thermography)
Measurement & Monitoring:
- HVAC
- Lighting
- Building envelopes
- Air movement and air infiltration
We solve problems:
- Professionals help find curtain wall flaws, roof/wall joint defects
- Prevent incorrect installations in new buildings, and detect them in existing buildings
- Find metering overcharges
- Reduce energy cost to levels predicted by modeling
Daylight Modeling
Daylight studies for:
- Glare control
- Luminous comfort
- Light pollution
- Energy savings
Expertise:
- Years of experience, including research at National Laboratory
- Strong connection to energy modeling and field testing
- Modeling with Radiance, the most accurate software for daylighting
Sample projects:
- Office buildings (Bank of America)
- Educational (St. Lawrence University)
- Library (Bronx Community Center)
- Bank (Royal Bank of Scotland)
- Laboratory (St Lawrence University Laboratory)
Heat Flow Analysis
Heat flow analyses for walls, roofs, windows:
- Reduce heat loss from thermal bridging
- Decrease moisture condensation risk
- Better estimate of energy use
Building systems include:
- Steel stud walls
- Columns, balconies, slab edge
- Window sills and roof parapets
- Curtain walls
- Penetrations through walls
Sample projects:
- Two-dimensional analyses for most energy projects
- Three-dimensional analyses by professionals at Viridian for:
- Four Times Square
- New York Times Headquarters
- World Trade Center Office Tower Four
Green Guidelines
Green/Energy Efficiency guidelines for:
- Buildings
- Campuses
- Corporate and Government policy
Types:
- Design and construction of buildings
- Operations
- Master planning
- Carbon footprint reduction
Sample projects:
- High Performance Infrastructure Guidelines (collaboration 2005)
- Technical Support for the New York State Green Building Tax Credit (2001-2008)
- World Trade Center Sustainable Guidelines (collaboration)
- Navy Whole Building Design Guide Web site "Operating & Maintaining a Green Building"
CFD analyses
Large spaces:
- Atriums (e.g., Shanghai Center 12 story atriums)
- Museums (e.g., American Museum of Natural History Planetarium)
- Train Stations (e.g., Rensellaer Train Station near Albany, NY)
Large glazed areas:
- Office buildings (e.g., Roanoke VA GSA building)
- Homes (e.g., Ryan Homes residences)
Natural ventilation:
- Educational (e.g., School of Environmental Sciences at Oberling College)
- Residential (e.g., W 42 Street high-rise residences in NYC)
NYSERDA Funded Project Energy Code Reviews
As part of this free review Viridian will:
- Review project design documents
- Discuss the results of the project review with the team members
- Meet on-site with the project team to review project compliance
- Provide general training on the ECCCNYS
- Explain relevant code requirements
- Address project-specific compliance issues
- Aid the project team in understanding the ECCCNYS
- Discuss suggested changes to design documents to be made prior to submission for local approval
- Provide a report summarizing potential non-compliance issues and recommended actions